Tag Archives: belt installation

Belt Replacement at a Long Distance Pipe Conveyor: Belt Design, Installation and Power Measurement

By A. Minkin, A. Jungk and T. Hontscha When the Arch Western Coal Skyline Mine decided to replace the old belt of its long distance BC-8 pipe conveyor, a new belt had to be designed to be suitable to the existing routing. In addition, a special installation procedure had to be developed to minimise downtime during the belt installation and commissioning. Continue reading Belt Replacement at a Long Distance Pipe Conveyor: Belt Design, Installation and Power Measurement